Brewery Kinshasa DRC

20180607_142835
kinshasa-drc-3.1182x716x1
kinshasa-drc-10.1182x716x1

Project specifications

Building type Production space, Storage space

Location Kinshasa, DRC

Surface 3.878 m²

Status Completed

New construction and maintenance

At a large brewery in Kinshasa DRC, we have carried out various activities over the years. A brief summary of our assignments:

2013
In 2012 we received the assignment to realise a storage space at the brewery. This assignment was carried out in 2013.

2015
We have realised a production space for line 7. This space was completed in 2016.

2016
In 2016 we replaced the roof of line 1.

2017
In 2017 we carried out various activities at the brewery:
The roof of line 2 has been replaced
Assembly of, among others, a cold store, PGP building and a cloakroom

2018
In 2017 we were commissioned to construct a building for a CO2 installation. This assignment was carried out in the summer of 2018.

For the client, it is a clear advantage that we work together with the local workers for the construction. In this way we create a source of income for the local stakeholders. In addition, they gain a lot of experience during assembly.

Erik van den HurkExportmanager

Do you also have building plans?

Curious what Remco International can do for you? Contact our specialist.

+31(0)88 004 93 00






    Read in our privacy statement how we process the data from this form.