Project specifications

Building type Production space, Storage space

Location Debre Birhan

Surface 3.826 m²

Status Completed

New construction of a malting plant

Remco International built the first malt house in Africa for Boortmalt, a Belgian company with malt houses all over the world. The malting plant is established in Debre Birhan, about 100 km from Addis Ababa, Ethiopia where we have realised several projects in the past.

Project size

The project comprises five different buildings with a total floor area of 3,826 m². In addition to engineering, we also took care of delivery, transport and assembly.

  • Malt Tower 822 m² floor space, height 32 meters
  • Steeping House 1,022 m² floor area, height 20 meters
  • Seed storage 563 m² linked by a canopy of 180 m² with Malt bagging building
  • Malt bagging 563 m²
  • Utility building 676 m²

Planning and assembly

The construction started January 2020. For the assembly, we worked with a local contractor led by one of our Dutch supervisors. Our international projects are always built with local workers. This provides a source of income for local stakeholders and they gain a lot of experience during assembly, which they can use during their further careers.The project was completed in August 2020.

About Boortmalt

Boortmalt is the largest malt producer in Europe and the largest commercial maltster worldwide. Boortmalt serves its customers worldwide from 27 locations across 5 continents. Read more: www.boortmalt.com

 

Erik van den HurkExport Manager

Do you also have building plans?

Curious what Remco International can do for you? Contact our specialist.

+31(0)88 004 93 00






    Read in our privacy statement how we process the data from this form.


    Customer reference

    MPM Business Navigators

    CEO | Project & Interim Manager Gerrit Klein talks about working with Remco International on the Boortmalt project in Debre Birhan, Ethiopia. “At the time we were looking for a company that could take care of the steel construction. The engineering firm involved in the project pointed us towards Remco International.
    They were involved in the engineering process, which involved various parties. That was not always easy. For example, we had to deal with differences in the designs, but the people at Remco International dealt with this very constructively. For the assembly we worked together with Lelacon, their local partner. That also went well, the planning was met and if not, it was beyond their control.
    In my opinion, the strength of the company lies in the fact that they take care of the design, transport and management as well as the construction supervision. They outsource the assembly locally, which makes them a flexible party that delivers a good price/performance ratio.”

    Gerrit KleinCEO | Project & Interim Manager