20190322Hercuton-SMALL-5

Step 2: Preliminary design, quotation and technical description

Based on the schedule of requirements discussed, a quotation will then be drawn up. This quotation is accompanied by a preliminary design and a technical description.

4

Step 4: Transport

Depending on the scope of the project, the materials will be produced and supplied in one or several phases. The materials are then loaded into shipping containers. Transport can be arranged by Remco Ïnternational in various ways, according to the applicable Incoterms. This international standard is developed and published by the International Chamber of Commerce (ICC), governing buyers’ and sellers’ rights and obligations as regards the international transport of goods. We also arrange the export documents that are required to allow the goods to be transported.